1. Reservation - It is not refundable but is part of the downpayment. Buyer can transfer reservation/payments to another person or unit provided under same developer and same price or price is higher than old unit.All payments made will be duly credited in the new owner/choosen unit. Walang penalty or mawawala sa payment. Just pay Php3,000.00 as transfer fee. Approval may take 1-2 weeks.


2. Monthly Downpayment - your first downpayment will start 30-40 days after you paid your reservation.Hindi po sabay ang pagbabayad ng reservation at first downpayment.

3. Monthly Amortization - the first monthly amortization will start after you have fully paid the downpayment. Hindi po magsasabay ang monthly downpayment at monthly amortization.

HOUSE BUYING SALES PROCEDURE FOR 12 MONTH DOWNPAYMENT:
Month 1 - DAY 1..........Reservation
Day 7-15.....Submission of Requirements
Month 2.....1st Monthly Equity or Downpayment
Month 3......2nd Monthly Equity or Downpayment
Month 4.....3rd - 12th Monthly Equity or Downpayment
Month 14....1st Monthly Amortization and House Turnover

4. Kailan Puwede Lumipat:
1.) For Pag-ibig Financing - after full payment of EQUITY/DP and Pag-ibig loan take out (Pag-ibig has paid the developer).Estimated time in loan processing is 4-5 mos after submission of full documents.
2. For Bank Financing - after full payment of downpayment and Bank loan take-out ( bank has paid the developer ).
3.) For In-house Financing - after full payment of Downpayment, puede na lumipat. No need for loan take-out.

5. Ready for Occupancy Units - there are now ready for occupancy units. Only in limited units.Full payment of downpayment is required before Buyer can transfer.Please take note that turn-over unit has only cement finish flooring in all floors.Buyer will shoulder the cost of tiles intallation and other improvements shown in the model houses.

 

6.) House Construction - starts while Buyer is on downpayment period. By the time Buyer finish paying downpayent, house will be almost finish and ready for turn-over.


7.) House Improvement - Developer only accepts deletion of tiles in Bathroom & Kitchen countertop. Deletion charge is Php1,000.00. Letter of request must be sent before house construction starts. Approval of request takes 2 weeks. Buyers will be informed. Buyer must get outside contractor to do the improvement of their unit.Buyer can only start installation of tiles/improvement after house is turned-over.
 
8
.) Move In Procedure:
a)Buyer needs to settle/ pay in full the required downpayment (inhouse) and with loan take out (pag ibig and bank).
b)Request letter to move in should be made by the buyer and notify developer's office.
c) Developer will issue notice to the buyer for the house inspection. Secure a certificate of acceptance from the Engineering site after house inspection, if there is needed repair during inspection.
d) Present the copy of certificate of acceptance issued by Engineering office and Developer will issue ATMI ( Authority to move in).
e) Present the ATMI at the site's security personnel for the entry of move in.
f) Present the ATMI to Engineering office for the turn over of house keys.

9.) Electric Power Supply (MERALCO) connection: 
a) Buyer needs to apply personally or his/her SPA to meralco branch office where the subdivision is located.
b) Bring necessary documents given by the developer when doing the application.
c) Search meralco website (www.meralco.com.ph) for the detailed step by step and requirements for power connection.
d) Pay the corresponding amount for the cost of power meter.
e) Present the meter and the request for meter installation job to the developer's engineering office.

10.) WATER Supply connection:
a) Buyer needs to request to the engineering office for the water supply connection.
b) Bring necessary documents given by the developer when doing the application.